GHMC started desilting of Nalas
The GHMC has underway nala desilting works of Rs. 30.18 crores with 100 kilometers of length of nalas in all the circles from Tuesday.
GHMC has started desilting of nala works before 5 months prior to the rainy season that GHMC has taken. Notably this type of initiative first time in the history of Municipal Corporation.
Every year the GHMC use to take up these works before one or two months on set of monsoon but as per the direction of the Minister MA&UD K. Taraka Rama Rao and city Mayor has called for tenders well in advance and started these works from January 31st onwards.
The GHMC is having 951 kilometers extent major nalas, drains, small nalas, pipe drain.
GHMC Commissioner, Dr.B.Janardhan Reddy said that the desilting works are being taken up in all circles office with modernized machines in major nalas and storm water drains with jetting machines.